Snippets

IMG 20220713 WA0001

Repair of Mastuj bridge begins

MASTUJ: Repair of Mastuj bridge has been started on the direction of the district administration of Upper Chitral.  Machinery was at the site and the gap between the two portions of the bridge was being filled by boulders and rocks.  The gap between the two parts of the bridge was filled instead of concreting it […]

Repair of Mastuj bridge begins Read More »