Chitral News

Roads blocked in Chitral after heavy snowfall

Lowari tunnel road opened

CHITRAL: The Lowari tunnel road between Chitral and Dir has been reopened after removing snow, said the office of the deputy commissioner Lower Chitral on Tuesday.  It said there is about 62 inch of snow on the Chitral side and 70 inch snow on the Dir side of the tunnel. Transporters have been asked to

Lowari tunnel road opened Read More »

IMG 20240304 WA0001 jpg e1709553404730

All main roads blocked in Chitral

CHITRAL: After three-day-long snowfall, TMA and NHA machinery have been mobilized to clear roads and Chitral bazar area of snow. However, all main roads out of the town area ate closed.  The district administration of Lower Chitral said that work to remove snow from Chitral-Dir road was also underway, but the approach road to Lowari

All main roads blocked in Chitral Read More »