Staff Correspondent
BOONI: The Upper Chitral district administration has initiated preparations to address safety concerns at the sliding-affected section of Chitral-Mastuj Road near Gahlasht Bridge.
A few days ago, a car carrying a family, including women, got stuck at the sliding point when stones and debris suddenly began rolling down the mountain and struck the vehicle. The occupants of the car miraculously saved their lives by running back to safety leaving the vehicle behind.
This morning, there were also reports about a falling stone hitting a van carrying schoolchildren. Fortunately, the students remained safe.
The administration plans for protective construction work and traffic diversion to ensure safer passage for commuters at the site
In this regard, Deputy Commissioner Upper Chitral Arshad Khan chaired a meeting to discuss measures to make the affected road section safe and suitable for traffic.
The meeting was attended by officials of the district administration, NESPAK Project Manager Ibrahim Khan and others.
During the meeting, the NESPAK project manager briefed the deputy commissioner about the challenges facing the proposed construction work, including technical difficulties and funding-related matters.
Deputy Commissioner Khan also contacted relevant officials of the National Highway Authority (NHA) and highlighted the urgency of addressing the situation. He directed the project manager to take immediate practical steps in accordance with the decisions made during the meeting.
It was decided that technical recommendations would first be obtained from the NHA consultant to determine the appropriate construction measures.
The proposed work includes construction of a protective retaining wall, necessary filling and arrangements for an alternative road diversion to maintain traffic movement during construction.
The deputy commissioner further directed the concerned project manager and contractor to keep machinery and manpower on standby at the site and ensure immediate mobilisation of construction equipment.
Meanwhile, Chitral Levies and police personnel will also remain on standby to regulate traffic and ensure the safety of commuters passing through the affected area.
The NESPAK project manager assured the meeting that the necessary arrangements would be made in accordance with the agreed proposals and that work would be initiated to make the location a permanently safer passage.
The planned measures are aimed at addressing the risks at the Gahlasht Bridge section, improving road safety and reducing travel difficulties for residents and commuters in Upper Chitral.
The details of the meeting were shared by the Information and Public Relations Department of the Upper Chitral district administration.
Related:

