CHITRAL: Federal Minister for Communications Abdul Aleem Khan has directed the National Highway Authority (NHA) to accelerate renovation, maintenance and rehabilitation work at Lowari Tunnel and speed up ongoing development projects on the N-45 highway in Chitral, APP reported.
During a one-day visit to Chitral on Tuesday, the minister chaired meetings with senior NHA officials, PML-N leaders, reviewed development projects and inspected the N-45 highway and various construction sites.
He said Lowari Tunnel was a vital gateway connecting Chitral with the rest of the country and had wider significance for regional connectivity with China, Afghanistan and other countries. He added that improving the road network in Chitral would help promote tourism and support economic development.
Taking notice of delays in the Mastuj, Shandur and Chitral-Kalash road projects, Khan directed the authorities to accelerate work and provide better travelling facilities to local residents. He stressed that the public should be able to see tangible improvements in NHA’s performance.
The minister also called for improvements in the pace and quality of work on the 309-kilometre N-45 highway, which connects Nowshera with Chitral. Local elders raised complaints about NHA-related issues during the visit, prompting him to direct officials to address public grievances on a priority basis.
Before reaching Chitral, Khan visited Lowari Tunnel and inspected its interior and exterior sections as well as ongoing construction and development work.
Expressing concern over previous traffic accidents at the tunnel, he ordered the introduction of modern and sustainable safety measures, particularly for managing traffic during snowfall. He directed the NHA to ensure ambulance, rescue and CCTV facilities at the tunnel, along with generators to maintain adequate lighting inside.
He also instructed officials to complete the remaining construction work as soon as possible without compromising quality and durability. The minister called for the development of rest areas, cafeterias and other facilities to make travel more convenient for tourists.
Khan said Lowari Tunnel was not only a crucial link between Dir and Chitral but also an important part of Khyber Pakhtunkhwa’s road infrastructure. He added that improving connectivity in Khyber Pakhtunkhwa and Gilgit-Baltistan was essential for regional development and economic growth.
According to the briefing given to the minister, an average of 2,462 vehicles pass through Lowari Tunnel every day, while the ongoing project is expected to be completed within the next two years.
Officials said Pakistan’s largest Lowari Tunnel consists of two tunnels with a combined length of more than 10 kilometres. They also informed the meeting that NHA development and construction projects worth Rs33 billion were currently underway.
Former MNA Shahzada Iftikhar Uddin and local elders welcomed the minister and presented him with a traditional Chitrali cap and gown. Federal Secretary for Communications, NHA Chairman, the NHA general manager for Khyber Pakhtunkhwa and other officials attended the meetings and briefings.
Related:

