Golen water supply line rehabilitation begins
The water resources of the 107 MW hydro powerhouse was also destroyed and the irrigation pipeline were washed away.
Haji Mehboob Azam, chief executive of a construction company, told ChitralToday that he had already completed the project in 2013 but since it is a flood prone area and there are frequent floods which damage the project.
“We can’t control natural disasters, but the rate of damage can be minimized, and that’s why this time we’re going to try to carry the pipeline through a safe route to prevent it from flood,” he said. Due to that, the damage was minimal or completely safe.–GH Farooqui