CHITRAL: A key bridge at Muxgol in the Mulkhow valley of upper Chitral was washed away in the 2015 floods.
The then KP minister Mahmood Khan, now the chief minister of the province, opened work on the construction of an RCC bridge over the river for Muxgol in May 2017. But due to the slow pace of work the bridge is still far from completion.
Local people have called upon the chief minister to take notice so that the project could be completed without further delay.–GH Farooqui
A key bridge at Muxgol Mulkhow was washed away in 2015 floods. The then KP minister Mahmood Khan, now CM, opened work on construction of an RCC bridge over the river in May 2017. But due to flow pace of work the bridge is still far from completion. GH Farooqui pic.twitter.com/EX4sCxsBBa
— Chitral Today (@ChitralToday) September 8, 2018
Read the details in this link